triangles decor triangles decor
#
#
#

Emergency and restoration repair of PL-10 kV Tsirkuny

After the end of the military operations in the Kharkiv region, Energy Group carried out emergency and recovery repairs of PL-10 kV Tsyrkuny.
During the works, 8 km of 10 kV electric-overhead line were restored, damaged supports (more than 80 pieces), traverses and insulators were replaced, new disconnectors and all other necessary electrical equipment were installed. Sicame high-voltage fittings were used during installation.
To provide backup power for this PL-10 kV, a high-voltage cable from PS-110 kV “Zhukovsky” with a length of 850 m was laid.

Presentation video Company «Energy Group»

Watch
promo video

    Request a call back