Our company for the enterprise “Western Bug” performed turnkey electrical work with the supply of equipment for the modernization of ПС35/10 kV, “Sakharozavod – Zbarazh”.
Equipment such as КРУН-10 kV, ВРУ-35 kV was manufactured at the facility and an oil transformer ТМН-6300/35/10 kV was supplied.
Installation work was also performed: installation of ВРУ-35 kV, РП-10 kV, installation of a power transformer ТМН-6300/35/10 kV, installation of grounding and lightning protection, commissioning, relay protection and commissioning.