Watch
promo video
Developing
Developing

Development and approval of project documentation of any complexity

FOLLOW
Equipment manufacturing
Equipment manufacturing

Full cycle of development and production of electrical equipment

FOLLOW
Electric installation work
Electric installation work

Efficient performance of a wide range of work in electrical installations up to 110 kV

FOLLOW
triangles decor
About company

Energy Group - Ukrainian manufacturer of electrical equipment

The Energy Group company is primarily a team of specialists with many years of experience in the power industry, which allows us to perform a wide range of electrical installation work with a warranty of up to 5 years.

LEARN MORE
#
WHY WE

Our advantages

  • # Transparent and fair pricing
  • # Specialists with 20 years of experience + 8 mobile teams of installers
  • # Own production (no extra charges and overpayments)
  • # Deferred payments
  • # Design as a gift
  • # Warranty up to 5 years
#
We help people find the best solutions.
triangles decor
Production

Full cycle of development and production of new generation electrical equipment

since 2016 it has been a manufacturer with a full production cycle and has established itself as a conscientious partner and supplier of transformer equipment throughout Ukraine
150

Employees work in the factory

200

Companies cooperate with us

#
#
#
#
#
#
#
triangles decor
OUR PROJECTS

Completed works

See all
#

A complex of works on the connection of the AKSA APD 1650 M diesel generator set for “Vetropak Gostomelskyi Sklozavod”

For "Vetropak Gostomelskyi Sklozavod" company, our company performed a complex of works on connecting the AKSA APD 1650 M diesel generator set in the amount of 2 pcs. The list of complex construction and assembly works included: - Installation of the foundation for the installation of diesel generators and generators; - Installation of the grounding device; - Installation of lightning protection with a separate grounding circuit; - Installation of overpass and cable laying systems; - Installation and connection of power cables; - Installation of the necessary number of РУ-0.4kV cells with the necessary equipment; - Complex of measurement of leakage resistances on grounding devices; - Complex of КЛ tests; - ПНС of generators and operating modes of capacity limitation; - Development of project and executive documentation.
#

Electrical installation works with the supply of equipment for the modernization of ПС35/10 kV, “Zukrozavod – Zbarazh”

#

Reconstruction РП – 27

Our company performed the reconstruction of RP-27 for the customer PJSC "Zaporizhjiaoblenergo". Cells with vacuum switches of own production "Energy Group" were delivered to the facility. A complex of works was also carried out, which included: - project development; - installation; - adjustment works Shipment to the facility and all works included in the complex were done quickly, and most importantly, with high quality!
#

Block complete transformer substation for “Chernigovoblenergo”

Our company "Energy Group" has produced a block complete transformer substation, which is a flexible solution for powering objects of any kind. The block complete transformer substation is assembled from a monolithic block, which allows you to protect the installed equipment from the effects of weather conditions and maintain the stable operation of the equipment for a long time. It has metal doors on both sides, which are equipped with internal locks. From the outside, the structure is covered with water-repellent plaster, namely marble crumb, which prevents moisture from getting inside. The roof is made in accordance with existing norms and requirements and protects against the penetration of precipitation inside the structure.
#

Delivered a complete transformer substation

Our company Energy Group delivered a complete transformer substation for the customers of Poltavahazvydobuvannya and Shebelynkahazvydobuvannya.
#

KTP 2x1000kva, installation work and cable laying on the overpass at the facility

Work on the facility in the village village Khrestyshche. A complete 2x1000 kVA transformer substation, control cabinets with frequency converters and a complete 3150 kVA transformer substation for connecting diesel generators were delivered to the work site. Installation work was also carried out and the laying of the cable along the overpass was carried out.
#

Emergency and restoration repair of PL-10 kV Tsirkuny

After the end of the military operations in the Kharkiv region, Energy Group carried out emergency and recovery repairs of PL-10 kV Tsyrkuny. During the works, 8 km of 10 kV electric-overhead line were restored, damaged supports (more than 80 pieces), traverses and insulators were replaced, new disconnectors and all other necessary electrical equipment were installed. Sicame high-voltage fittings were used during installation.
#

Power substation “Zhukovsky”

We have completed the construction of the construction and supply of a complete, enclosed, enclosed enclosure of the 10 kV type, which is assembled from KЗO-319, on the basis of Schneider Electric electrical control and a microprocessor attachment, automation, control, and installation of the MRZS series.
#

КТП 1000 kVA for “Kharkiv Metro”

The work was completed in the shortest possible time, taking into account all the requirements and wishes. In the manufacture of КТП, Ukrainian-made materials were used to the maximum. Thanks to the КТП, which has a quick installation and ease of transportation, ease of connection and commissioning, it is possible to restore power to damaged objects for their further operation. Considerable attention should also be paid to the modern method of powder painting, which has a significant share of advantages, namely: resistance to abrasive abrasion, resistance to temperature changes, impact resistance, excellent protection against corrosion.
#

Avangard, Residential Complex “Grekiv Lis”

Production of another product from our company Energy group - КРПЗ. This time, we supplied КРПЗ - 10 kV and КРПЗ - 35 kV. The complete closed-type switchgear was manufactured by order of Avangard for the residential complex "Grekiv Lis". The metal structure of the КРПЗ in our case is easy to mount and has a modern and practical design. КРПЗ-10 and 35 kV were delivered to the installation site in separate transportable units and assembled on the territory of the substation. The КРПЗ blocks were equipped with cells of modern complete switchgears at the production site. After the successful delivery of the equipment, a full range of works on installation, connection and testing is carried out.
#

JSC “Trest Zhilstroy-1”

Our production in the shortest possible time manufactured equipment for transformer substations and distribution points of Trest Zhilstroy-1 JSC in Kharkov, Kharkov region. Our company has manufactured the following equipment: – Production of KSO-319 type cells for voltage 10.6 kV in the amount of 40 pieces; – Production of KSO-219 type cells for voltage 10.6 kV in the amount of 28 pieces; – Production of cells of the ShchO-90 type for a voltage of 0.4 kV; in the amount of 51 pieces.
#

Power supply of UPG “Machuhi”

To increase the reliability of power supply for the II category of the UPG "Machuhi" of DTEK PrJSC "Neftegazdobycha", our company performed the following work. Type of work: unit KTP-250/6/0.4 through passage type with cable inlet and cable outlet, with power transformer TMG-250/6/0.4; installation of a protective earthing device KTP ...
#

Power supply LLC “Vasishchevsky Plant of Vegetable Oils”

As a result of the work performed, Vasishchevsky Plant of Vegetable Oils LLC received, in the shortest possible time, the opportunity to power its own loads with high-quality electricity with a dedicated power of 1500 kW according to the II category of power supply reliability.
#

Power supply of the woodworking plant of SE “Lamella”

For the power supply of the industrial premises of the woodworking plant DP "Lamella" with an area of ​​more than 6000 m2, a complex of electrical installation works was performed. Type of work: development and examination of project documentation; installation of a lightning protection and grounding system; installation of working and emergency...
#

Power supply device for PJSC “Ukrnefteburenie” Mining Company”

During the quarantine, EnergyGroup performed work on the supply and installation of electrical equipment for Ukrnefteburenie. Completed reconstruction of the 6 kV overhead line with a length of 4.5 km, delivery of a complete KTП-1600 kVA transformer substation manufactured by EnergyGroup with a Tesar dry transformer. Despite the closed border and interruptions in transport logistics, EnergyGroup fulfilled all its obligations, the commissioning of the installed equipment took place on time.
#

Technical re-equipment of PS-35/10 kV “Borky Selskaya”

Our specialists completed the manufacture, supply of equipment and work on the power supply of solar power plants with a capacity of 2.2 MW on the territory of the Borkovo village council of the Zmievsky district, Kharkiv region...
#

Technical re-equipment of the 110/10 kV substation “Vypovzovo” in the village of Desna, Chernihiv region for “Chernygovoblenergo”.

As part of the reconstruction, replacement of oil switches with gas switches, installation of current and voltage transformers up to 110 kV inclusive, grounding device and a complex of commissioning works were carried out. Reconstruction of the electrical supply of PJSC "Dneprometiz" For the implementation of the works, technical specialists developed a project for the reconstruction of the electrical supply and the design of the necessary equipment.
#

Construction of a new 35/0.4 kV substation of “Monolith” SC

Our company Energy Group completed turnkey work on the construction of a 35/0.4 kV substation for SC "Monolit". The key features of this project are complex remote control systems, solar battery protection and automation.
#

Reconstruction of the electric supply of PJSC “Dneprometiz”

To carry out the work, technical specialists developed a project for the reconstruction of the electrical supply and the design of the necessary equipment. After the completion of the preparatory work, a new two-transformer substation with an installed capacity of 3,200 kVA produced by ENERGYGROUP was delivered. The reconstruction of the Metiznaya substation was completed by the laying of a high-voltage power cable with cross-linked polyethylene insulation on the production site, and the testing of the installed equipment.
#

Design development and layout of TP-RP 6/0.4 kV “Sarzhinskaya”

Our company Energy group developed and built the structure for the 6/0.4 kV "Sarzhynskaya" RP-TP. A feature of this design is its non-standard dimensions (5200x4800mm). As well as the use of KСO type 219 cells. The construction of a metal structure with an area of more than 25 m2, with high energy-saving characteristics, is a difficult task that our team successfully coped with. The electrical part is made on the basis of Schneider Electric equipment.
#

Delivery of a complete two-transformer substation with a capacity of 800 kVA for LLC “SLOBODA-BUDELEKTROMONTAZH”

In February, the EnergyGroup company shipped a complete two-transformer substation with a new color scheme. The design department developed the substation according to the Customer's specifications. In production, the project was implemented in the shortest possible time. The EnergyGroup team is ready to implement any bold and unusual solutions of the Customer.
#

Supply of 2KTPk-630 kVA for “ARGO KOM” LLC

At the end of spring, EnergyGroup received an order for the production of a complete two-transformer substation with a power oil transformer with a capacity of 630 kVA. The design of the substation was developed individually for the Customer. After the successful delivery of the equipment, a full range of installation, connection and testing of the equipment was carried out.
#

Overhaul of the “Stepanovka” 35/10 kV transformer substation for “Sumyoblenergo” LLC

As part of the capital repair of the TP, the supply and replacement of three VM-35 type oil switches with BP-35 NSM vacuum switches, as well as the replacement of RZA chains, were made.
#

Overhaul of power transformers

Our company "ENERGYGRUP" LLC carried out major repairs of TM-35/2500kVA power transformers for DTEK CJSC "Neftegazdobycha" at the "Klymovo" 35/6 kV substation. Type of work: opening of the transformer, dismantling, installation of the active part, repair of HV and LV isolators; revision of the active part of the power transformer...
triangles decor
WE ARE TRUSTED

Our clients

Among the company's customers are many large commercial and government organizations operating in various industries

  • Trust Zhilstroy-2
  • Huawei
  •  Trust Zhilstroy-1
  • Naftogaz
  • Burisma
  • Ukrzaliznytsia
  •  Vinnitsaoblenergo
  • UNB
  • Novaagro
  • LTD
  • Ferrexpo
  •  Avantage
  • Zaporozhyeoblenergo
  • Lugansk Energy Association
  •  Factor-Druk
  • Chernihivoblenergo
  • DTEK
  • Kharkovoblenergo
  • Sumyoblenergo

Presentation video Company «Energy Group»

Watch
promo video

    Request a call back