Technical re-equipment of PS-35/10 kV “Borky Selskaya”

Technical re-equipment of PS-35/10 kV “Borky selskaya” for connection of SES with a capacity of 2.2 MW of “Solar Solutions Ukraine” LLC to the energy system of Ukraine

Specialists of our company carried out a range of works aimed at the creation and supply of power equipment, connection to the electricity supply of a solar power plant (power of 2.2 MW) in the Zmiiv district of the Kharkiv region – the territory of the Borkov village council.

Completed works:

  • Two КРУН-10 cells were made.
  • New cells were installed in the PS-35/10 kV substation.
  • A 10 kV cable line was installed in the ground with preparatory and finishing works.
  • Laboratory tests of the system constructed by us were carried out.
  • Commissioning works have been completed.
  • A fully ready-to-use object was put into operation.

To solve the problem of laying an underground cable line with a length of 1124 m:

  • They made a puncture under the railway track
  • A single-core, insulated (XPLE) cable of the АПвЭгП-15 brand was used.

The term of work is 1 month. The result is the connection of a solar power plant produced by “Solar Solutions Ukraine” LLC to the power capacity of JSC “Kharkovoblenergo”.