To carry out the work, technical specialists developed a project for the reconstruction of the electrical supply and the design of the necessary equipment. After the completion of the preparatory work, a new two-transformer substation with an installed capacity of 3,200 kVA produced by ENERGYGROUP was delivered. The reconstruction of the Metiznaya substation was completed by the laying of a high-voltage power cable with cross-linked polyethylene insulation on the production site, and the testing of the installed equipment.