Construction of a new 35/0.4 kV substation of “Monolith” SC

Construction of a new 35/0.4 kV substation of “Monolith” SC

Our company Energy group completed turnkey work on the construction of a 35/0.4 kV substation for SC “Monolit”. The key features of this project are complex remote control systems, solar battery protection and automation.

Construction of a new 35/0.4 kV substation of Monolith SC

Our specialists completed the design, manufacture, supply of equipment and work on the power supply of a 2.4 MW solar station for the Monolyt SC in the city of Merefa, Kharkiv region.

We performed:

  • Designing, manufacturing and installation of a 35/0.4 kV substation;
  • Designing and installation of the required number of 0.4 kV power lines;
  • Designing and installation of solar station protection equipment against non-synchronous inclusion in the network;
  • Conducting commissioning works and laboratory tests;
  • Commissioning of the assembled facility;

The project envisages the possibility of online monitoring of the status and protection against non-synchronous switching on of the grid for SES.